Location: Altamonte Springs, Florida
Type: Multifamily
Scheduled Delivery: Q4 2024
Units: 261
The Aston at Uptown project sits on a 3.51-acre site located at 505 One Center Boulevard in Altamonte Springs, Florida.
The site improvements consist of water, storm, and sewer utilities that tie into existing public utilities. Additional improvements include resort-style hardscaping, landscaping, irrigation, asphalt paving, and concrete sidewalks.
The 261-unit development features a mix of 1-, 2-, and 3-bedroom units within a 5-story building, including several basement units fronting E. Central Parkway.
The project includes a 6-story parking garage, a central courtyard, a resort-style swimming pool, and a Clubhouse. The Clubhouse offers a 2-story fitness center, games lounge, sports simulator, and clubroom, and houses the leasing offices.
Construction consists of wood framing with an exterior combination of fiber cement siding, stucco, and brick and stone veneer. The roofing system comprises a single-ply TPO membrane. All building slabs are post-tensioned concrete on grade.
Interior finishes include painted drywall walls and ceilings with a smooth finish, as well as a mix of luxury vinyl plank flooring and carpet in all units. Thermofoil cabinetry and stainless-steel appliances are installed in all kitchen areas, with quartz countertops in both kitchens and bathrooms. All units include a full-size washer and dryer.