PARK PLACE TAMPA

The two apartment buildings wrap around a 7-story, 211,000-square-foot precast parking garage. The development also includes a 23,000-square-foot amenity area on the top seventh level of the garage with luxury features:

The Park Place project is a 758-bed student housing community situated on a 4.5-acre at 3400 East Fletcher Avenue in Tampa, Florida.

The development consists of two 5-story apartment buildings, each containing 166,000 square feet and 205,000 square feet, and a 3,500-square-foot leasing office will accompany the first building.

Site improvements consist of hardscaping, landscaping, irrigation, asphalt paving, concrete sidewalks, water, stormwater, and sewer utilities that will tie into existing public utilities.

Construction is generally wood frame with fiber cement siding, metal panel, and stucco. Roofing consists of 60-mil Thermoplastic Polyolefin (TPO). Interior finishes consist of painted drywall walls, ceilings with a textured finish, and vinyl plank flooring.

More
Projects

CEO |

James a. Gray

Gray co-founded FaverGray in 2005 and has more than 45 years of experience in design and construction management in the residential, commercial and industrial market sectors. As CEO, Gray is responsible for leading the development of FaverGray’s short and long term strategy, creating and implementing FaverGray’s vision and mission, maintaining awareness of the competitive market landscape, evaluating expansion opportunities and industry developments, maintaining social awareness and responsibility within FaverGray’s market sectors, assessing and managing corporate risks and management of banking and surety relationships.